Most tile failures don't start with the tile. They start underneath.
Approved Member
The Tile Association
5★ Google Reviews
Verified Reviews
23+ Years Experience
One Specialist Craft
Fully Insured
Public Liability
I provide professional tile and subfloor preparation in Warrington and across Cheshire, ensuring every installation begins with a stable, level and properly reinforced base. Whether it's a timber floor, concrete slab, extension or wet room build-up, preparation comes first. If the base isn't right, the finish won't last. As a tiler in Warrington, I use self-levelling compounds, decoupling systems, and proper waterproofing to ensure your tiling — whether large-format porcelain or bathroom tiles — lasts decades. Levelling, boarding and membrane starting prices are on the tiling cost guide.
Answer a few questions about the job and add photos. Get an indicative price before arranging anything.
Takes a couple of minutes.
Answer a few quick questions for a rough idea of what preparation may be needed before tiling. Not a fixed quote — final advice depends on photos and a site inspection.
Start the checkerMovement in the subfloor is one of the most common causes of tile failure. Decoupling systems isolate the finished surface from that movement, protecting your tiles and grout long-term.
Manage expansion and contraction to protect tiles from cracks due to subfloor movement.
Improve the lifespan of the tiled surface by minimising stress and potential damage.
Some decoupling systems can form part of a waterproof assembly when seams, junctions and penetrations are detailed to the manufacturer's specification. Their main job is movement management — not damp-proofing a floor.

SEE IT IN PRACTICE
Check out how we handled this on a real project:

Cracking grout and floor movement were the warning signs. See what was found beneath the tiles and how the wet-room floor was rebuilt properly.
Learn more
Tiles are a finish, not waterproofing. The real protection is the preparation underneath — and that's what actually stops water damage.
Learn moreTaking new bookings from
Late September
Earlier dates now available: Due to a change in my schedule, I’ve unexpectedly had some earlier dates become available. Get in touch if you’d like to discuss your project.
Related Movement Solutions
Every job prepared properly, precisely set out, and finished to last.
Swipe to see more services
Examples of recent work across Cheshire and South Manchester.
Swipe to see more case studies