Size of the floor
Large open areas are efficient to set out and lay. Small floors still involve travel, setup, cutting, grouting and a return visit, so they do not price as a tiny area multiply.
Floor tiling prices
Floor tiling cost is the installation labour plus whatever is needed to make the base suitable. A clear, flat screed is one job; an old tiled timber floor that needs lifting, strengthening, boarding and decoupling is another. Area matters, but the condition and construction below the tiles often matter more.
Indicative estimate from Paul's live 2026 price book. It is not a fixed quotation.
On floors, the first thing I want to know after the area and tile size is what I’m actually tiling onto. A decent screed can make a large floor fairly straightforward. The same size floor over timber, old tiles or a badly uneven base can need a lot of work before a tile is laid. I would rather price that preparation properly at the start than hide it inside a square-metre rate and hope the floor behaves.
Paul Finn, working tiler
Large open areas are efficient to set out and lay. Small floors still involve travel, setup, cutting, grouting and a return visit, so they do not price as a tiny area multiply.
Concrete, screed, timber and existing tiles require different checks and preparation. Movement or poor flatness must be dealt with first.
Taking up the existing finish and clearing the waste is separate from installing the new floor.
Large tiles, planks, patterns, fitted units, islands, doorways and awkward cuts slow the installation and setting-out.
It asks for the inputs that actually move the work instead of multiplying one headline rate by the room area.
A 20m² extension on a ready, level screed is mainly an installation. A 20m² kitchen over timber, with units and an island left in place, may need removal, strengthening, boarding, levelling and far more cutting before the first full tile is fixed. The area is identical; the workload is not.
The fixed time for travel, setup, mixing, cutting, grouting and cleanup does not shrink in proportion to the floor area.
No. Installation labour assumes a suitable base. Levelling is assessed and priced separately when the existing floor needs it.
Sometimes, but only after checking that the existing installation is firmly bonded, suitable and does not create unacceptable height or movement issues.
Put your room, tile and preparation into the estimator and get a useful starting figure.