Floor construction
Timber and mineral floors behave differently. The build-up must suit the actual substrate rather than follow one standard recipe.
Preparation before tiling
Preparation is not an optional extra added to make a quote look bigger. It is the work that gives the tiled finish a suitable, stable and flat base. The correct build-up depends on whether the floor is screed, concrete, timber, already tiled, cracked, uneven or carrying movement between different substrates.
Indicative estimate from Paul's live 2026 price book. It is not a fixed quotation.
When I look at a floor, ‘does it need levelling?’ is not the first question. I want to know what the floor is built from, whether there is movement, how flat it is, what is under the existing covering and whether different substrates meet in the same area. Levelling, boarding and decoupling solve different problems. I don’t want to specify one just because it is on a checklist.
Paul Finn, working tiler
Timber and mineral floors behave differently. The build-up must suit the actual substrate rather than follow one standard recipe.
A floor can be flat without being level, or level without being flat. Large-format tiling chiefly needs the surface flat enough for the chosen tile.
Extensions, cracks, timber flex and changes of substrate may require strengthening, movement joints or a decoupling membrane.
The true condition is sometimes hidden by old tiles or adhesive. A sensible estimate separates confirmed work from preparation that can only be known after strip-out.
It asks for the inputs that actually move the work instead of multiplying one headline rate by the room area.
The expensive failure is skipping preparation because the finished tiles hide it. A floor can look acceptable on day one and still crack, debond or show lipping later. Pricing the base separately makes clear which work is protecting the installation rather than pretending it is included for free.
No. It is used when the substrate needs correcting for the proposed installation. The floor should be assessed rather than levelled by default.
Often it needs strengthening or a suitable tile-backer build-up, but the answer depends on the boards, joists, movement and height available.
It helps manage differential movement between the substrate and tile finish. It is not a substitute for repairing an unsound floor.
Put your room, tile and preparation into the estimator and get a useful starting figure.