A full ground-floor renovation in Oaklands, WA4, where lifting the existing tiled floor exposed significant substrate and remedial issues. The timber floor was strengthened and overboarded where required, localised levelling and an anti-cracking decoupling membrane were installed, and 1200x1200 large-format porcelain was laid to a continuous, level finish through the main ground-floor area.
02
03
04
From substrate condition through to the finished result.
Existing tiled floor before removal — the starting point across the main ground-floor area.
The old tiles and adhesive were stripped back to the structural substrate, exposing significant substrate and remedial issues. The timber floor was strengthened and overboarded with plywood where required, localised levelling brought the floor into a single plane, and an anti-cracking decoupling membrane was bonded across the whole floor to isolate the new tiling from movement below.
1200x1200 large-format porcelain installed over the decoupling membrane using a mechanical levelling clip system to keep the large tiles flat and lippage-free across the whole floor.
The levelling clip system holds every tile flush, and doorway transitions were formed as bespoke tiled, mitred details in place of standard trims. The floor was finished with a polyurethane resin grout for a hard-wearing, colour-stable joint.
A continuous, level porcelain floor running through the main ground-floor area with no thresholds breaking the run.
Send the project details and a few photos. You deal directly with Paul from first message to final finish.